Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jan 26, 2002     Tail jig construction - (13 hours)       Category: Tail Feathers
Built the tail jig, using kiln-dried Douglas Fir 4x4s for the uprights and crosspiece. The 4x4s were hand-picked and were the straightest ones I could locate in Rockford, IL. The vertical pieces were bolted to the floor, and I added end braces to make the jig very stable.

After it was in place, I established a centerline on the jig, and installed overhead plumb wire that passes thru the post, then runs to a tension turnbuckle on the side.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.